Massive 8.9-magnitude quake hits Japan (84)

1 Name: tor : 2011-03-11 09:33 ID:jwpPoqzB

http://www.youtube.com/watch?v=871E8_DJ-rw
NHK live http://www.ustream.tv/channel/jishinsokuhou
In the first nuclear plant in Fukushima of Tokyo Electric Power Company in Fukushima Prefecture, to cool the nuclear reactor safely in two nuclear power plants that stopped due to the earthquake, it was judged that it was unnecessary and the ability to do it becoming impossible to use all of "Diesel generator for the emergency" and continuing cooling was not enough. Therefore, Tokyo Electric Power Company did the report that informed them of "Emergency" at 5:00PM to Nuclear and Industrial Safety Agency of the Ministry of Economy, Trade and Industry based on Special Law on Nuclear Disaster Countermeasures following the report of "Extraordinary happenings" that had been done at 4:00PM. Nuclear and Industrial Safety Agency advances the confirmation, and is examining information about the correspondence in the future. The influence outside of the leakage of the radioactive substance at present etc. is not in the first nuclear power plant in Fukushima. Nuclear and Industrial Safety Agency keeps observing it continuously. After this law is enforced in 2000, it is the first time that the report that informed them of "Emergency" was done based on Special Law on Nuclear Disaster Countermeasures. http://mayuge11.blog40.fc2.com/
http://edition.cnn.com/2011/WORLD/asiapcf/03/11/japan.quake/index.html?hpt=T1

This thread has been closed. You cannot post in this thread any longer.